Connaught Gardens Area Quieter Neighbourhood
This project has now concluded.
Enfield Council are in the process of delivering a series of measures in the Connaught Gardens area as part of the Quieter Neighbourhood project.
The aim of this scheme is to address shared concerns between both residents and the Council on motor traffic speeds, motor traffic volumes, and cut-through traffic in the area. A set of interventions is being delivered to address the concerns raised by residents for many years. The scheme will help address the issue on an area-wide basis and bring about the following benefits:
- Reduction in the volume of motor traffic that is cutting through residential streets instead of using other primary roads to reach their destinations.
- Reduction in the speeds that people drive at on the residential streets and in front of the schools within the area.
- Quieter residential areas with reduced traffic levels, whilst keeping open the maximum possible access points for residents and emergency services.
- A safer environment which will enable people to walk and cycle from their front door and encourage them to incorporate active travel as part of their journeys.
- Reduction in emissions from motor vehicles within the residential area and therefore an improvement air quality.
- Long-term improvements to public health and reduced pressure on the NHS.
The Connaught Gardens Quieter Neighbourhood scheme is being delivered in two phases, as outlined below:
Stage of Delivery | Proposals | Funding Arrangements | Timeframe | Feedback Opportunities |
Phase 1 | One-way system on Windsor Road, Osborne Road, and short sections of Lightcliffe Road and New River Crescent. | Council funded | Completed in January 2021. | Delivered using Experimental Traffic Orders (ETOs), with views from the community collected during a trial period. |
Phase 2 | The remaining Quieter Neighbourhood measures as shown in the scheme map (note engagement with emergency services continues). | Initial funding secured from TfL to enable design work to progress. Awaiting further funding from Department for Transport / Transport for London to enable future implementation. | Design in progress. Implementation timescale presently unknown and subject to funding. | Early engagement with residents on the designs has taken place. The comments are being analysed to help finalise the future scheme that is going to be delivered. A formal 6-month consultation will follow as part of the trial to inform future of the scheme. |
On this project page you can find:
- Key project dates in the Key Dates section on the right-hand side.
- Project updates in the News Feed below.
- A Document Library and Important Links on the right-hand side which contain key documents.
- A list of Frequently Asked Questions (FAQs) which will be periodically updated.
This project has now concluded.